1. Construction Bids/RFS's
 


Recent Messages
93-22 Haskell R. Street WWTP Fats, Oils, and Grease Receiving Station Improvements Published on Dec 9, 2022 11:10
CMAR/RFP SW03-23 CMAR for Will Ruth Pond and Palisades SW Imp Published on Dec 8, 2022 11:06
CMAR/RFP125-22 Haskell R. Street WWTP Various Improvements Project Published on Nov 30, 2022 15:27
93-22 Haskell R. Street WWTP Fats, Oils, and Grease Receiving Station Improvements Published on Nov 29, 2022 14:05
93-22 Haskell R. Street WWTP Fats, Oils, and Grease Receiving Station Improvements Published on Nov 16, 2022 11:07
CMAR/RFP125-22 Haskell R. Street WWTP Various Improvements Project Published on Nov 15, 2022 15:20
CMAR/RFP SW03-23 for the Will Ruth Pond and Palisades SW Improvements Published on Nov 15, 2022 09:23
SW68-22 Coates and Tremont Dam Improvements Published on Nov 10, 2022 15:08
113-22 NE Frank Dist Wtr Mn Haggerty Ph 1 & Interceptor Published on Nov 9, 2022 17:21
RFP/CMAR 112-22 Backup Generators & Diesel Fuel Storage Published on Nov 8, 2022 16:35
113-22 NE Frank Dist Wtr Mn Haggerty Ph 1 & Interceptor Published on Nov 8, 2022 13:32
SW68-22 Coates and Tremont Dam Improvements Published on Nov 8, 2022 09:20
93-22 Haskell R. Street WWTP Fats, Oils, and Grease Receiving Station Improvements Published on Nov 7, 2022 16:29
113-22 NE Frank Dist Wtr Mn Haggerty Ph 1 & Interceptor Published on Nov 7, 2022 09:33
CMAR/RFP125-22 Haskell R. Street WWTP Various Improvements Project Published on Nov 3, 2022 16:53
52-22 Zaragoza Water and Sewer Improvements Published on Oct 28, 2022 16:31
105-22 Woods Reservoir Rehabilitation Published on Oct 26, 2022 12:55
RFEI-CMAR Will Ruth Pond & Palisades Published on Oct 26, 2022 12:48
RFP/CMAR 112-22 Backup Generators & Diesel Fuel Storage Published on Oct 21, 2022 17:13
SW68-22 Coates and Tremont Dam Improvements Published on Oct 14, 2022 14:56
113-22 NE Frank Dist Wtr Mn Haggerty Ph 1 & Interceptor Published on Oct 14, 2022 14:44
52-22 Zaragoza Water and Sewer Improvements Published on Oct 14, 2022 14:32
RFEI-CMAR for the Haskell R. Street Wastewater Treatment Plant Various Improvement Projects Published on Oct 7, 2022 14:35
87-22 JRWTP Settling Pond Gate Improvements Published on Oct 4, 2022 12:22
CMAR RFP112-22 CMAR BACKUP POWER GENERATORS AND DIESEL FUEL STORAGE AND DISPENSING SYSTEMS Published on Oct 3, 2022 17:39
67-22 North Hills 1.0 MG Reservoir Coating Rehabilitation Published on Sep 20, 2022 17:11
67-22 North Hills 1.0 MG Reservoir Coating Rehabilitation Published on Sep 2, 2022 15:54
64-22 North Res Roof Rehab & Cielo Vista .1 MG Grnd Storage Tank Published on Aug 30, 2022 11:42
98-22 Grouse Street Force Main Rehabilitation Phase VI Part 2 Published on Aug 26, 2022 17:07
64-22 North Res Roof Rehab & Cielo Vista .1 MG Grnd Storage Tank Published on Aug 26, 2022 14:52
CMAR/RFP 88-22 Construction Manager-at-Risk (CMAR) Contractor Services for Advanced Water Purif Published on Aug 26, 2022 10:22
CMS for the Roberto R. Bustamante Wastewater Treatment Plant Expansion and Upgrades Published on Aug 23, 2022 17:13
19-22 Published on Aug 16, 2022 16:37
35-22 Nevins and Crown Point II Packed Tower Air Strippers Published on Aug 10, 2022 17:01
19-22 EDA Northwest Development Sewer Main Extension Published on Aug 10, 2022 15:34
09-22 Planned Waterline Replacement Program Phase XII A Published on Aug 10, 2022 15:27
89-22 Haskell Street WWTP Chlorine Scrubber and Wash Press Replacement Project Published on Aug 9, 2022 11:36
98-22 Grouse Street Force Main Rehabilitation Phase VI Part 2 Published on Aug 8, 2022 10:01
19-22 EDA Northwest Development Sewer Main Extension Published on Aug 5, 2022 16:51
09-22 Planned Waterline Replacement Program Phase XII A Published on Aug 5, 2022 16:41
64-22 North Res Roof Rehab & Cielo Vista .1 MG Grnd Storage Tank Published on Aug 5, 2022 15:59
09-22 Planned Waterline Replacement Program Phase XII A Published on Aug 4, 2022 11:15
09-22 Planned Waterline Replacement Program Phase XII A Published on Jul 29, 2022 17:09
89-22 Haskell R. Street WWTP Chlorine Scrubber & Wash Press Replacement Projects Published on Jul 29, 2022 14:32
89-22 Haskell R. Street WWTP Chlorine Scrubber & Wash Press Replacement Projects Published on Jul 29, 2022 14:10
35-22 Nevins and Crown Point II Packed Tower Air Strippers Published on Jul 29, 2022 13:50
CMAR/RFP 88-22 Construction Manager-at-Risk (CMAR) Contractor Services for Advanced Water Purif Published on Jul 28, 2022 11:30
77-22 Sunset Reservoir No.1 Rehabilitation Published on Jul 26, 2022 12:06
35-22 Nevins and Crown Point II Packed Tower Air Strippers Published on Jul 25, 2022 14:23
19-22 EDA Northwest Development Sewer Main Extension Published on Jul 25, 2022 14:12
89-22 Haskell R. Street WWTP Chlorine Scrubber & Wash Press Replacement Projects Published on Jul 25, 2022 14:01
84-22 Power Meter Implementation for the Wastewater Treatment Plants Published on Jul 22, 2022 16:19
CSP50-22 Ranchos Real PS & Airport Booster Station Published on Jul 21, 2022 14:28
CMAR/RFP 88-22 Construction Manager-at-Risk (CMAR) Contractor Services for Advanced Water Purif Published on Jul 20, 2022 16:59
84-22 Power Meter Implementation for the Wastewater Treatment Plants Published on Jul 20, 2022 17:01
CSP50-22 Ranchos Real PS & Airport Booster Station Published on Jul 20, 2022 11:24
RFP88-22 CMAR Contr Srvcs for Adv Wtr Purification Facility Published on Jul 18, 2022 17:45
71-22 Miranda 18-Inch Wastewater Relief Line Published on Jul 18, 2022 17:29
84-22 Power Meter Implementation for the WWTP Published on Jul 18, 2022 17:03
77-22 Sunset Reservoir No. 1 Rehabilitation Published on Jul 18, 2022 17:10
09-22 Planned Waterline Replacement Program Phase XII A Published on Jul 15, 2022 11:52
CMAR/RFP 88-22 Construction Manager-at-Risk (CMAR) Contractor Services for Advanced Water Purif Published on Jul 12, 2022 16:59
84-22 Power Meter Implementation for the Wastewater Treatment Plants Published on Jul 8, 2022 13:05
CMAR/RFP 88-22 Construction Manager-at-Risk (CMAR) Contractor Services for Advanced Water Purif Published on Jul 8, 2022 11:21
77-22 Sunset Reservoir No.1 Rehabilitation Published on Jul 8, 2022 10:04
SW43-22 Mesa St. & Texas Ave. Stormwater Main Replacement Published on Jul 6, 2022 14:15
RFS82-22 Precon & Const Mgmt Svcs, New Main Admin Bldg Published on Jul 5, 2022 16:26
CSP50-22 Ranchos Real PS & Airport Booster Station Published on Jun 23, 2022 11:54
71-22 Miranda 18-Inch Wastewater Relief Line Published on Jun 23, 2022 10:00
SW41-22 Saint Marks Drainage Improvements Published on Jun 22, 2022 14:10
SW43-22 Mesa St. & Texas Ave. Stormwater Main Replacement Published on Jun 22, 2022 09:50
63-22 Cielo Vista 0.1 MG Ground Storage Tank Published on Jun 7, 2022 11:26
SWCSP22-22 Ft. Bliss Stormwater Diversion Access Structures Published on Jun 6, 2022 13:18
40-22 24in to 36in Steel Cylinder Concrete Pipeline Replacement, EP Int'l Airport Corridors D and E Published on Jun 2, 2022 16:30
SWCSP22-22 Ft. Bliss Stormwater Diversion Access Structures Published on Jun 2, 2022 12:59
40-22 24in to 36in Steel Cylinder Concrete Pipeline Replacement, EP Int'l Airport Corridors D and E Published on Jun 2, 2022 12:38
SWCSP22-22 Ft. Bliss Stormwater Diversion Access Structures - Central Area Published on Jun 1, 2022 10:53
63-22 Cielo Vista 0.1 MG Ground Storage Tank Published on May 31, 2022 15:57
40-22 24in to 36in Steel Cylinder Concrete Pipeline Replacement, EP Int'l Airport Corridors D and E Published on May 27, 2022 15:26
18-22 Country Club and Sunset Lift Stations Published on May 25, 2022 16:45
SWCSP22-22 Ft. Bliss Stormwater Diversion Access Structures Published on May 24, 2022 11:34
CSPSW22-22 Ft. Bliss Stormwater Diversion Access Structures-Central Area Published on May 23, 2022 13:22
06-22 Rehabilitation of High Chaparral Reservoir Published on May 19, 2022 13:50
SWCSP22-22 Ft. Bliss Stormwater Diversion Access Structures Published on May 17, 2022 11:00
40-22 24 TO 36-INCH STEEL CYLINDER CONCRETE PIPELINE REPL EL PASO INTERNATIONAL AIRPORT CORRIDORS Published on May 16, 2022 16:44
06-22 Rehabilitation of High Chaparral Reservoir Published on May 13, 2022 14:23
63-22 Cielo Vista 0.1 MG Ground Storage Tank Published on May 9, 2022 17:12
18-22 Country Club and Sunset Lift Stations Published on May 9, 2022 16:15
06-22 Rehabilitation of High Chaparral Reservoir Published on May 9, 2022 10:19
40-22 24 To 36-Inch Steel Cylinder Concrete Pipeline Published on May 6, 2022 19:11
12-22 Montana East 36-inch Water Line Extension Published on May 3, 2022 16:03
06-22 Rehabilitation of High Chaparral Reservoir Published on May 3, 2022 14:47
RFP62-22 Bustamante Wastewater Treatment Plant Upgrade Published on Apr 27, 2022 12:54
12-22 Montana East 36 Inch Water Line Published on Apr 27, 2022 12:42
26-22 Bird Avenue 18-inch Gravity Sewer Line Replacement Published on Apr 27, 2022 12:43
06-22 Rehabilitation of High Chaparral Reservoir Published on Apr 27, 2022 12:41
26-22 Bird Ave 18-inch Gravity Sewer Replacement Published on Apr 25, 2022 10:12
08-22 La Mesa Sewer Relief Line Published on Apr 25, 2022 10:10
12-22 Montana East 36 Inch Water Line Extension Phase II Published on Apr 22, 2022 15:02
44-22 Canal Water Treatment Plant Published on Apr 22, 2022 14:19
RFP62-22 Bustamante WWTP Upgrades and Expansion Published on Apr 22, 2022 14:20
RFP62-22 Bustamante Wastewater Treatment Plant Upgrade Published on Apr 20, 2022 15:40
44-22 Canal Water Treatment Plant - Primary Sedimentation Basin Covers Published on Apr 19, 2022 11:39
RFP/CMAR 58-22 EPWater Main Administration Building Published on Apr 15, 2022 08:58
26-22 Bird Ave 18-inch Gravity Sewer Replacement Published on Apr 13, 2022 12:42
SW25-22 Carolina Drive Retention Pond Published on Apr 12, 2022 17:30
44-22 Canal Water Treatment Plant - Primary Sedimentation Basin Covers Published on Apr 12, 2022 17:29
39-22 Delta Planned Water Line Replacement Published on Apr 12, 2022 16:58
45-22 ALAMEDA AVE. / ROSEWAY DR. (SENECA DR. TO FOSTER DR.) SEWER MAIN REPLACMENT Published on Apr 12, 2022 13:36
RFS54-22 East High and Franklin East 1 Pressure Zone Published on Apr 12, 2022 13:05
RFP/CMAR 58-22 EPWater Main Administration Building Published on Apr 12, 2022 13:04
12-22 Montana East 36-inch Water Line Extension Published on Apr 7, 2022 14:22
RFP62-22 Bustamante Wastewater Treatment Plant Upgrade Published on Apr 6, 2022 11:50
17-22 Luckett Wastewater Replacement Published on Apr 6, 2022 10:44
RFP/CMAR 58-22 EPWater Main Administration Building Published on Apr 5, 2022 17:19
SW25-22 Carolina Drive Retention Pond Published on Apr 5, 2022 16:21
45-22 ALAMEDA AVE. / ROSEWAY DR. (SENECA DR. TO FOSTER DR.) SEWER MAIN REPLACMENT Published on Apr 4, 2022 11:56
45-22 ALAMEDA AVE. / ROSEWAY DR. (SENECA DR. TO FOSTER DR.) SEWER MAIN REPLACMENT Published on Mar 31, 2022 11:08
SW25-22 Carolina Drive Retention Pond Published on Mar 31, 2022 11:24
17-22 Luckett Wastewater Replacement Published on Mar 25, 2022 14:09
23-22 NE Franklin Distribution Water Main & NE Franklin Interceptor Sean Haggerty Phase I Published on Mar 24, 2022 16:45
39-22 Delta Planned Water Line Replacement Published on Mar 24, 2022 16:14
RFP/CMAR 58-22 Published on Mar 21, 2022 14:21
Copy of 45-22 ALAMEDA AVE. / ROSEWAY DR. (SENECA DR. TO FOSTER DR.) SEWER MAIN REPLACMENT Published on Mar 18, 2022 14:36
45-22 ALAMEDA AVE. / ROSEWAY DR. (SENECA DR. TO FOSTER DR.) SEWER MAIN REPLACMENT Published on Mar 17, 2022 15:49
24-22 Water Trans Main Rpl Trevino & Yarbrough Published on Mar 16, 2022 10:29
44-22 Canal Water Treatment Plant - Primary Sedimentation Basin Covers Published on Mar 15, 2022 09:32
15-22 Waste Water Field Office, New Building, Boone St Published on Mar 10, 2022 14:40
51-22 Motor Control Center Replacement Published on Mar 8, 2022 11:22
30-22 Northeast Aquifer Storage and Recovery Phase 1 Published on Mar 7, 2022 17:39
Request of Expression Interest CMAR Bustamante Published on Mar 7, 2022 14:19
24-22 Water Transmission Main Replacement at Gas Line Crossings Lee Trevino Dr. and Yarbrough Dr. Published on Mar 4, 2022 13:08
15-22 Wastewater Field Office Rehab New Building Published on Mar 1, 2022 16:45
29-22 Fred Hervey Reactor and Recarbonation Clarifiers Replacement Published on Mar 1, 2022 16:45
01-22 Mesa Street Crestmont to Festival Reservoir 30 Inch Water Transmission Line Published on Mar 1, 2022 16:10
NE Franklin Distribution Water Main Sean Haggerty Phase I & NE Franklin Interceptor Sean Haggerty P Published on Feb 23, 2022 15:17
29-22 Fred Hervey Reactor and Recarbonation Clarifiers Replacement Published on Feb 22, 2022 13:07
31-22 NE Sewer Interceptor & 16-Inch Water Imp Published on Feb 11, 2022 12:14
29-22 Fred Hervey Reactor and Recarbonation Clarifiers Replacement Published on Feb 10, 2022 17:11
13-22 Mountain Park #1 Pump Station to Mountain Park #2 Water Line Extension Published on Feb 7, 2022 16:05
31-22 NE Sewer Interceptor & 16-Inch Water Imp Published on Jan 26, 2022 17:00
33-21 NE Sewer Interceptor & 16-Inch Water Imp Published on Jan 24, 2022 09:57
RFP79-21 Construction Manager At-Risk Services (CMAR) Roberto R. Bustamante Wastewater Published on Jan 19, 2022 13:13
RFP79-21 Construction Manager At-Risk Services (CMAR) Roberto R. Bustamante Wastewater Published on Jan 12, 2022 15:42
70-21 Northwest Water Distribution High Plains Published on Dec 1, 2021 15:29
49-21 Eastside Planned-Service Area-Montwood Extension, 16" Water Main Extension Published on Nov 29, 2021 16:30
70-21 Northwest Water Distribution High Plains Published on Nov 22, 2021 11:29
Liquid Oxygen Published on Nov 22, 2021 11:08
31-21 Doniphan Collector to Canutillo Bosque Lift Station Published on Nov 22, 2021 11:09
49-21 Eastside Planned Area-Montwood Extension, 16-inch Water Main Extension Published on Nov 8, 2021 15:32
70-21 Northwest Water Distribution-High Plains Published on Nov 8, 2021 11:18
44-21 Coronado 1 Booster Station Pump Can Replacement Published on Aug 5, 2021 15:46
44-21 Coronado 1 Booster Station Pump Can Replacement Published on Jul 29, 2021 09:19
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jul 28, 2021 10:23
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jul 26, 2021 14:10
44-21 Coronado 1 Booster Station Pump Can Replacement Published on Jul 21, 2021 16:52
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jul 19, 2021 14:36
18-21 Westway 20-inch Potable Water Line Extension Published on Jul 15, 2021 15:40
20-21 Peyton Road 16-inch Water Line Extension Published on Jul 15, 2021 15:40
37-21 Lift Station Rehabilitation Sunland Park Lift Station No. 113 Published on Jul 15, 2021 15:29
15-21 Village of Vinton 16-Inch Transmission Water Line Phase II Published on Jul 15, 2021 15:28
29-21 Riverside International Center For Water, Wastewater and Stormwater Systems Published on Jul 15, 2021 15:29
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jul 12, 2021 08:48
44-21 Coronado 1 Booster Station Pump Can Replacement Published on Jul 9, 2021 12:41
05-21 Plant Equipment Maintenance Shop Published on Jul 8, 2021 17:22
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jul 8, 2021 15:12
33-21 Rehabilitation of Redd Road Reservoir Published on Jul 7, 2021 16:41
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jul 6, 2021 15:02
35-21 Airport Well Field Electrical Improvements Corridor C Published on Jun 24, 2021 15:49
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jun 24, 2021 15:39
33-21 Rehabilitation of Redd Road Reservoir Published on Jun 23, 2021 16:32
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jun 22, 2021 17:40
33-21 Rehabilitation of Redd Road Reservoir Published on Jun 22, 2021 17:29
05-21 Plant Equipment Maintenance Shop Published on Jun 22, 2021 17:29
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jun 22, 2021 16:09
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jun 22, 2021 08:23
35-21 Airport Well Field Electrical Improvements Corridor C Published on Jun 21, 2021 14:20
33-21 Rehabilitation of Redd Road Reservoir Published on Jun 21, 2021 12:10
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jun 17, 2021 13:05
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jun 16, 2021 17:02
29-21 Riverside International Center For Water, Wastwater and Stornwater Systems Published on Jun 16, 2021 14:49
14-21 John T. Hickerson WRF Ultraviolet Disinfection Replacement Published on Jun 16, 2021 11:57
05-21 Plant Equipment Maintenance Shop Published on Jun 16, 2021 11:07
SW19-21 Old Spanish Trail Spillway Reconstruction Published on Jun 15, 2021 10:18
SW08-21 Stevens Street Alley Storm Drain Improvements Published on Jun 14, 2021 08:57
20-21 Peyton Road 16-inch Water Line Extension Published on Jun 14, 2021 08:56
33-21 Rehabilitation of Redd Road Reservoir Published on Jun 9, 2021 12:33
29-21 Riverside International Center For Water, Wastwater and Stornwater Systems Published on Jun 9, 2021 12:02
18-21 Westway 20-inch Potable Water Line Extension Published on Jun 9, 2021 12:02
SW08-21 Stevens Street Alley Storm Drain Improvements Published on Jun 4, 2021 09:03
SW08-21 Stevens Street Alley Storm Drain Improvements Published on Jun 1, 2021 09:45
46-21 KB Hutchinson Source Water Augmentation Parallel Pipeline Published on Jun 1, 2021 09:45
35-21 Airport Well Field Electrical Improvements Corridor C Published on May 28, 2021 11:52
29-21 Riverside International Center For Water, Wastwater and Stornwater Systems Published on May 25, 2021 11:14
18-21 Westway 20-inch Potable Water Line Extension Published on May 18, 2021 14:15
14-21 John T. Hickerson WRF Ultraviolet Disinfection Replacement Published on May 18, 2021 12:55
20-21 Peyton Road 16-inch Water Line Extension Published on May 14, 2021 16:05
15-21 Village of Vinton 15-Inch Transmission Water Line Phase II Published on May 14, 2021 12:11
37-21 Lift Station Rehabilitation Sunland Park Lift Station No. 113 Published on May 14, 2021 10:29
15-21 Village of Vinton 15-Inch Transmission Water Line Phase II Published on May 12, 2021 11:19
SW08-21 Stevens Street Alley Storm Drain Improvements Published on May 10, 2021 12:44
18-21 Westway 20-inch Potable Water Line Extension Published on May 7, 2021 16:35
18-21 Westway 20-inch Potable Water Line Extension Published on May 7, 2021 12:00
15-21 Village of Vinton 15-Inch Transmission Water Line Phase II Published on May 7, 2021 12:00
37-21 Lift Station Rehabilitation Sunland Park Lift Station No. 113 Published on May 6, 2021 09:07
17-21 Phosphate Feeding Facilities at Five Booster Station Sites Published on May 5, 2021 15:45
17-21 Phosphate Feeding Facilities at Five Booster Station Sites Published on May 5, 2021 12:12
16-21 Vinton (Westway) 1.25 MG Ground Storage Tank Published on May 5, 2021 10:31
37-21 Lift Station Rehabilitation Sunland Park Lift Station No. 113 Published on May 3, 2021 15:40
16-21 Vinton (Westway) 1.25 MG Ground Storage Tank Published on Apr 30, 2021 15:52
17-21 Phosphate Feeding Facilities at Five Booster Station Sites Published on Apr 30, 2021 08:27
17-21 Phosphate Feeding Facilities at Five Booster Station Sites Published on Apr 28, 2021 14:37
15-21 Village of Vinton 15-Inch Transmission Water Line Phase II Published on Apr 28, 2021 08:52
16-21 Vinton (Westway) 1.25 MG Ground Storage Tank Published on Apr 28, 2021 08:51
37-21 Lift Station Rehabilitation Sunland Park Lift Station No. 113 Published on Apr 27, 2021 14:17
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Apr 21, 2021 13:55
17-21 Phosphate Feeding Facilities at Five Booster Station Sites Published on Apr 16, 2021 16:53
15-21 Village of Vinton 15-Inch Transmission Water Line Phase II Published on Apr 16, 2021 08:48
37-21 Lift Station Rehabilitation Sunland Park Lift Station No. 113 Published on Apr 15, 2021 12:46
16-21 Vinton (Westway) 1.25 MG Ground Storage Tank Published on Apr 14, 2021 17:37
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Apr 13, 2021 14:20
17-21 Phosphate Feeding Facilities at Five Booster Station Sites Published on Apr 6, 2021 10:36
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Apr 5, 2021 16:32
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Apr 5, 2021 15:22
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Apr 5, 2021 13:11
16-21 Vinton (Westway) 1.25 MG Ground Storage Tank Published on Apr 2, 2021 10:37
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Mar 24, 2021 15:25
24-21 Jonathan Rogers Water Treatment Plant Raw Water Improvements Published on Mar 22, 2021 13:17
04-21 Fred Hervey Water Reclamation Plant Blower Building and Aeration System Improvments Published on Mar 10, 2021 13:07
04-21 Fred Hervey Water Reclamation Plant Blower Building and Aeration System Improvments Published on Mar 2, 2021 17:15
04-21 Fred Hervey Water Reclamation Plant Blower Building and Aeration System Improvments Published on Feb 23, 2021 11:04
04-21 Fred Hervey Water Reclamation Plant Blower Building and Aeration System Improvments Published on Feb 18, 2021 14:22
71-20 Fred Hervey Water Reclamation Facility Equalization Pump Replacement Project Published on Feb 10, 2021 15:16
04-21 Fred Hervey Water Reclamation Plant Blower Building and Aeration System Improvements Published on Feb 9, 2021 14:27
04-21 Fred Hervey Water Reclamation Plant Blower Building and Aeration System Improvements Published on Feb 3, 2021 14:32
71-20 Fred Hervey Water Reclamation Facility Equalization Pump Replacement Project Published on Dec 18, 2020 16:01
RFS 79-20 Haskell R. St. Wastewater Treatment Plant Fats, Oils and Grease Receiving Station Improv Published on Dec 18, 2020 15:00
71-20 Fred Hervey Water Reclamation Facility Equalization Pump Replacement Project Published on Dec 11, 2020 07:57
71-20 Fred Hervey Water Reclamation Facility Equalization Pump Replacement Project Published on Dec 4, 2020 16:59
59-20 On-Call Manhole Rehabilitation for Wastewater Facilities Construction Contract Published on Nov 23, 2020 16:54
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Nov 23, 2020 16:43
71-20 Fred Hervey Water Reclamation Facility Equalization Pump Replacement Project Published on Nov 20, 2020 11:43
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Nov 16, 2020 15:13
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Nov 13, 2020 17:08
59-20 On-Call Manhole Rehabilitation for Wastewater Facilities Construction Contract Published on Nov 12, 2020 16:13
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Nov 6, 2020 16:53
Bid 27-20: Montana East 24-Inch Water Main Extension Improvements Published on Nov 5, 2020 16:24
59-20 On-Call Manhole Rehabilitation for Wastewater Facilities Construction Contract Published on Nov 5, 2020 09:51
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Nov 3, 2020 15:57
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Nov 2, 2020 10:25
59-20 On-Call Manhole Rehabilitation for Wastewater Facilities Construction Contract Published on Oct 30, 2020 12:00
56-20 Fred Hervey WRP Virgin Carbon Feed Upgrage Published on Oct 30, 2020 12:00
56-20 Fred Hervey WRP Virgin Carbon Feed Upgrage Published on Oct 29, 2020 15:28
59-20 On-Call Manhole Rehabilitation for Wastewater Facilities Construction Contract Published on Oct 29, 2020 15:28
Bid 56-20 Fred Hervey WRP Virgin Carbon Feed Upgrade Published on Oct 29, 2020 11:17
Bid 59-20 On-Call Manhole Rehabilitation for Water, Wastewater and storm Water Facilities Constructi Published on Oct 29, 2020 09:16
27-20 MONTANA EAST 24 INCH WATER MAIN EXTENSION IMPROVEMENTS Published on Oct 22, 2020 14:26
Bid 56-20 Fred Hervey WRP Virgin Carbon Feed Upgrade Published on Oct 21, 2020 10:17
62-20 Robert R Bustamante WWTP-Digester No. 2 Rehabilitation Published on Oct 19, 2020 10:04
62-20 Roberto R Bustamante Wastewater Treatment Plant - Digester No. 2 Rehabilitation Published on Oct 19, 2020 08:34
62-20 Robert R Bustamante WWTP-Digester No. 2 Rehabilitation Published on Oct 13, 2020 16:25
Bid 56-20 Fred Hervey WRP Virgin Carbon Feed Upgrade Published on Oct 6, 2020 08:56
Bid 62-20 Robert R Bustamante WTP - Digester No. 2 Rehabilitation Published on Oct 5, 2020 16:28
Bid 56-20 Fred Hervey WRP Virgin Carbon Feed Upgrade Published on Oct 5, 2020 16:28
12-20 Franklin East 1 Tank to Vista Del Norte Development 24-Inch Water Line Extension Published on Sep 4, 2020 16:04
Bid 12-20 Franklin East 1 Tank to Vista Del Norte Development 24-Inch Water Line Extension Published on Sep 2, 2020 11:09
Bid 46-20 Pumping Systems, Furnish, Installation and Maintenance Phase II Published on Sep 1, 2020 15:35
Bid 12-20 Franklin East 1 Tank to Vista Del Norte Development 24-Inch Water Line Extension Published on Aug 27, 2020 10:03
Bid 46-20 Pumping Systems, Furnish, Installation and Maintenance Phase II Published on Aug 25, 2020 12:49
Bid 12-20 Franklin East 1 Tank to Vista Del Norte Development 24-Inch Water Line Extension Published on Aug 18, 2020 11:53
46-20 Pumping Systems, Furnish, Installation and Maintenance Phase II Published on Aug 14, 2020 14:25
36-20 On-Call Water Distribution System Construction & On-Call Sanitary Sewer System Const. FY20-21 Published on Aug 5, 2020 12:35
Bid 41-20 Roberto R Bustamante Wastewater Treatment Plant Return Flows Diversion Published on Aug 4, 2020 10:44
Bid 41-20 Roberto R Bustamante WTP Return Flows Diversion Addendum 2 Published on Aug 4, 2020 10:34
Bid 46-20 Pumping Systems, Furnish, Installation and Maintenance Phase II Published on Jul 29, 2020 09:29
Bid 36-20 OC Water Distribution System Construction Contract FY20-21 and OC Sanitary Sewer System Published on Jul 29, 2020 08:28
Test Published on Jul 27, 2020 09:23
Bid 35-20 Haskell Street WWTP Secondary Clarifiers Published on Jul 24, 2020 18:09
Bid 46-20 Pumping Systems, Furnish, Installation and Maintenance Phase II Published on Jul 20, 2020 13:17
Bid 41-20 Roberto R Bustamante Wastewater Treatment Plant Return Flows Diversion Published on Jul 7, 2020 17:25
Bid 36-20 Haskell Street WWTP Secondary Clarifiers Splitter Box 36-Inch Sluice Gates Replacement Published on Jul 7, 2020 16:35
SW02-20 San Lorenzo Ave. CMP Replacement & Sanitary Sewer Improvements Published on Jun 16, 2020 09:27
24-20 Lift Station Decommissioning and Demolition Mesquite Trails and Paseos Del Sol Lift Stations Published on Jun 9, 2020 12:03
SWCSP32-20 Doniphan & Frontera Junction Box Rehabilitation Published on Jun 9, 2020 11:33
34-20 Festival 2MG Water Storage Reservoir Coating Rehabilitation Published on May 13, 2020 09:39
Addendum 2: 22-20 On-Call Construction Boring Services Published on May 1, 2020 16:16
Addendum 1: 22-20 On-Call Construction Boring Services Published on Apr 30, 2020 09:23
22-20 On Call Construction Boring Services Published on Apr 13, 2020 08:53
Field Office and Customer Service Building Published on Feb 3, 2020 08:29
03-20 Upson Drive Water Main and Sewer Improvements Published on Jan 22, 2020 10:31
RFQ114-19 Roberto Bustamante WTP Headworks Improvements Published on Nov 5, 2019 09:35
Bid 95-19 Fred Wilson Administration Area Remodel Published on Sep 20, 2019 11:30
Bid 94-19 Lift Station Decommissioning and Demolition Jail Annex Lift Station No. 22 Published on Sep 19, 2019 11:06
TXDoT changes impact Hawkins Published on Sep 18, 2019 08:23
RFQ108-19 Design and Construction of John T. Hickerson WRF Rehabilitation Project Published on Sep 17, 2019 10:42
Bid 66-19 Canal Water Treatment Plant Chlorine Handling Improvements Published on Sep 10, 2019 10:57
Bid 23-19 Airport Well Field Electrical Improvement Corridor D & Corridor A Published on Aug 26, 2019 14:27
Bid 80-19 Bustamante WWTP Silo Structural Improvements Published on Jul 29, 2019 10:40
Bid 37-19 North 2 (11.8 MGD) Pump Station Published on Jul 26, 2019 10:45
Bid 47-19 Montana Vista Waste Water Collection System - Phase I Published on Jul 23, 2019 12:30
46-19 Waste Water Diversion from Haskell R. Street WWTP to Fred Hervey WRP Published on Jul 22, 2019 08:49
Professional Service Solicitations Published on Jul 10, 2019 15:15
Bid 72-19 Fred Hervey WRP and Bid 73-19 RR Bustamante WWTP Aeration Published on Jul 9, 2019 15:01
RFS75-19 Bywood Drive Drainage System Improvements Published on Jul 9, 2019 09:59
Bid 63-19 Cielo Vista Elevated Water Tank Safety Ladders and Fall Protection Published on Jul 1, 2019 11:10
New Requests for Submittals Published on Jun 26, 2019 08:52
RFS68-19 Corrugated Metal Pipe Condition Assessment and Replacement Program Published on Jun 18, 2019 13:39
RFS78-19 Lift Station Reconstruction: Prado, Mansfield, and Knowles Lift Stations Published on Jun 18, 2019 13:39
RFS78-19 Lift Station Reconstruction: Prado, Mansfield, and Knowles Lift Stations Published on Jun 18, 2019 13:29
Bid 30-19 Canutillo Bosque Rd. Lift Station and Force Main Re-Bid Published on Jun 4, 2019 16:04
Canal WTP Long Term Structural Repairs Phase 3 Published on May 23, 2019 14:42
Bid SW18-19 Sam Snead Storm Drain System Published on May 21, 2019 15:21
Bid 32-19 Montoya II and Navarrette Lift Stations Rehabilitation Improvements Published on May 1, 2019 14:18
Bid 31-19 Misc Improvements to Existing Air Release Valves at EPWU Force Mains Published on Apr 19, 2019 15:46
Grouse Street Force Main Rehabilitation Published on Apr 12, 2019 10:13
Bid 26-19 Coronado III Water Tank Access Bridge Published on Mar 20, 2019 14:48
Pumping Systems Furnish, Installation and Maintenance Published on Feb 20, 2019 16:58
Bid 02-19:Resler Dr North of Transmountain 24-Inch Transmission Water Main Phse IV Published on Dec 7, 2018 09:46
RFQ 115-18: Powdered Activated Carbon Published on Nov 19, 2018 08:47
Bid 90-18: Jonathan rogers WTP Surge Control Improvements Published on Nov 14, 2018 14:58

El Paso Water | All Rights Reserved | Powered by CivicLive | © PowerSchool Corporation