PM 9070 |
9.7 |
Pre-Construction Conference Agenda Format Example (doc) |
FC 91802 |
9.18.2 |
Schedule of Shop Drawing Submitals (doc) |
FC 91901 |
9.19.1 |
Inspector's Quality Assurance Report (pdf) |
FC 91913 |
9.19.13 |
Record of Non-Complying Tests (doc) |
FC 91917 |
9.19.17 |
Non-Compliance Notice (doc) |
FC 92002 |
9.20.2 |
Daily Report Extra Work - T & M (doc) |
CM 92003A |
9.20.3 |
Work Directive Change (doc) |
CM 92003B |
9.20.3 |
Work Directive Change Example (pdf) |
CM 92012A |
9.20.12 |
Change Order Cover, Form and Engineer's Cost Summary and Classification (doc) |
CM 92012B |
9.20.12 |
Change Order Check List (doc) |
MS 92102A |
9.21.2 |
Progress Report - Construction Phase Example 1 (pdf) |
MS 92102B |
9.21.2 |
Progress Report - Construction Phase Example 2 (pdf) |
CM 92206 |
9.22.6 |
Engineer's Certificate of Substantial Completion (doc) |
CM 92214A |
9.22.14 |
Engineer's Certificate of Final Completion (doc) |
CM 92214B |
9.22.14 |
Verification Items to Certificate of Final Completion (doc) |
CM 92301 |
9.23.1 |
Contractor's Project Close-Out Submittals Checklist (doc) |
CM 92303 |
9.23.3 |
Standard Final Release and Waiver of Lien on Final Payment (pdf) |
CM 92305 |
9.23.5 |
Completed Operations Insurance Sample Letter (pdf) |
CM 92306 |
9.23.6 |
Consent of Surety to Final Payment (pdf) |
GA 92311 |
9.23.11 |
Record Drawing Package Submittal Checklist (doc) |
PM 92317 |
9.23.17 |
Contractor Performance Evaluation Form (xls) |